Our Clients

Our Clients

ALLTEC products and services have been utilized by an international array of private companies and governments from conventional and alternative energy to telecommunications and petrochemical infrastucture.

Telecom Grounding Systems — Part III

March 10, 2017|Articles, Engineering Services, Grounding/Bonding, Telecommunications, TerraDyne, TerraFill, Traditional Grounding|

In Part 3 of our series on telecom grounding systems, we will concentrate on Motorola R56 Chapter 4 - External Grounding (Earthing). There are many sections in the Motorola R56 specifications, including site design and development, communications, building and design, internal grounding, power sources, surge protective devices, minimizing interference, and equipment installation.

Engineering Services

Engineering & Product Solutions

Our experienced engineering and project management teams apply ALTTEC’s Protection Pyramid™ framework to develop the best solution for every situation.

Grounding / Bonding

Level I – Protection Pyramid

The basic level begins with the design of a grounding system stable that directs damaging electric currents safely to the ground

Surge Suppression

Level II – Protection Pyramid

The second tier is built from installing surge protection devices that reduces the magnitude of random high-energy, short-duration electrical power anomalies

Protection Systems

Lightning Protection

Level III – Protection Pyramid

Contact us to find out what risk mitigation products & services work best for your industry.

Contact Us
Contact Us